If you require a Resource Consent prior to a building consent we are more than happy to work with you through the process to obtain Resource Consent.
note: consultancy fees such as land surveyor are excluded.
These drawings may include (but are not limited too):
Presentation Drawing (NTS)
Site Plan (1:200); GIS Plan; Location Plan
3D View showing Sunlight Access Plane Breaches (NTS)
Contour Plan (1:100)
Sunlight Shading Analysis (NTS)
Existing Plan (1:100) if required.
Proposed Plan (1:100)
Roof Plan (1:100)
Elevations (1:100)
Assessment of environmental effects document